Green Wedge Integrated Farm/Land Management Report - Boneo
Lewis Building Design
Mornington
Project Included
- Integrated Farm/Land Management Report
- Landscape Plan for a drainage line and perimeter
- Soil Testing for Agriculture
PROJECT OVERVIEW
A proposal on just 5 acres with potable water for the production of food (market garden and orchard). The site contained recruiting native remnants that were proposed for conservation, fenced off, and managed for pest weeds and animals. There was a drainage line that traversed the property that was proposed to be regenerated with riparian vegetation and perimeter vegetation to the north to reconnect patches of vegetation.